Picture caption: One of Bristol’s waterways. Picture credit: westernaspect.com
If you’ve arrived in Bristol by train lately, you’ll have seen all the building work going on, and there’s more to come following the council’s approval of the £350-million Temple Island regeneration scheme.
Part of the Temple Quarter regeneration zone, Legal & General’s scheme is a pivotal piece in the city’s quest to deliver more homes and jobs around Bristol Temple Meads, the central train station. Its approval by Bristol City Council clears the way for enabling works and a more detailed planning application.
Designed by Zaha Hadid Architects, the masterplan for Temple Island includes 520 homes, two office buildings, retail and commercial space, a hotel with conference facilities, a new public square, and walking and cycling routes.
A real selling point of this scheme is the chance to turn one of the city’s biggest brownfield sites into a desirable place to live and work. The homes will have excellent transport links so they’ll be perfect for regular travellers, especially those who aren’t likely to be kept awake by the rumble of nearby trains.
The site was formerly a rail maintenance depot and had been derelict for decades. As it was contaminated with diesel, it has taken a great deal of work to clean it up and bring the land back into usable condition.
Work has also gone into installing a new electricity infrastructure, telecoms, a new water main, drainage and heating pipework. With all of this in place, the site can be developed without the need for further excavation.
The district heating pipework will enable low-carbon heating and hot water for the homes and commercial buildings on the site, which will contribute to the city’s Mission Net Zero goal to be carbon neutral by 2030.
Stabilisation works have also been done, with the site being levelled and stabilised, and structural fill used to provide a strong foundation for construction. Access routes along the A4 have been strengthened to take construction traffic, and repairs to river walls along the Avon have improved long-term structural stability.
On top of this, there is a Biodiversity Net Gain strategy for the scheme, to make sure that habitats impacted by the build are replaced and enhanced in off-site nature recovery projects across the city.
But not everyone is happy with the development. Critics have declared the design of the new tower blocks “depressing” and have expressed concerns that the build will block an iconic view.
Those in favour include the University of Bristol, which is building a new Enterprise Campus adjacent to the site.
Overall the entire Temple Quarter regeneration programme is expected to provide 10,000 new homes and thousands of jobs for the city. There will always be pros and cons to a project like this, but I would argue that the safe development of an unused brownfield site makes sense. If the land can be used to create homes and bring jobs to Bristol, in a great location, why not use it?
Meanwhile, if you need any assistance with the structural elements of an upcoming project, please do get in touch.